embeint.htf
Production workflows

Production workflows

Keep firmware, device IDs, operators, and results connected.

HTF brings together the work around a production test: the firmware used, the IDs assigned to a DUT, the station that ran it, and the evidence from each stage.

Start with the workflow you need:

  • Applications and firmware — zip a HEX file, upload a version, download it, and use it from a station.
  • DUT records and IDs — import identifiers, reserve them, and commit them after successful use.
  • Results and logs — browse full history, compare station performance, assess retries and availability, and download logs.
  • DUT capture history — search structured values, compare retests, and export test evidence.
  • Operator kiosk — give a jig a station-specific operator screen.

For a first test, you can skip firmware and ID pools and run the basic print stage. Add production resources as the test plan needs them.